The biggest problem today was a lack of trucks to carry materials to the dump. It seems that these are the sort of delays one often faces on a large job such as this. If all goes well tomorrow all of the demolition on the north side of the sanctuary will be complete (with the exception of one tree, see below). There is however a large amount of demolition (tree clearing, etc.) that still is coming around the front (the Westheimer side) of the sanctuary in preparation for the new parking lot.
Center Point Energy was also on-site today to make preparation for moving a gas line that is very near a tree that still needs to be removed. Hopefully this work will be done in the next 3-5 days.