Early this morning (Monday) the last of the major mechanical components arrived on site, the fire sprinkler system. This will be the first (and only) building on campus that is equipped with a sprinkler system.
Work is also continuing on the installation of windows and other interior space detail. On the outside the final prep work is being done for the installation of the brick. If all goes according to plan the exterior of the building will really come together in the next three weeks. Over the weekend the last of the main roof was installed. There is still plenty of roofing detail to be finished but everything is under-roof so that work can continue rain or shine.