Wednesday, April 16, 2008

Oh, so Blue

They continue to install the blue metal on the south entrance (youth room entrance) of the building. Below the blue is the door and to the right are two large windows (one above the other). On the right side brick wall will be brushed metal letters (not blue) reading: Memorial Lutheran Church and School.

Because this part of the building faces Westheimer (but is set back because of the new parking) I hope that the color and the strong architectural design (the angled brickwork) will draw attention to us.

No comments: