Although not part of the construction project the school is taking this time to do some work on the playground drainage. Over the last several years we have experienced several floods inside the school building because of inadequate drainage along the north side of the building and also a large lake (loving called Lake Memorial) that pools up in the playground.

This past week our plumbing contractor (Raven) cleaned out one of the large playground drains. The drain was dug-up and cleared of gravel and sand. This little bit of work will go a long way in helping with the problems.